Wunderland Airport

In the past years, embedded between Knuffingen and Switzerland, Miniatur Wunderland’s latest layout arose – our passenger airport. After more than 6 years of construction, it was inaugurated on May 4th 2011, at last. The development of the Airport began in June 2005, already. In 2008 the planning phase was finalized, and the final building plans were worked out.
Since the 22nd of August 2008 the plan was lying on the layout base, initiating the construction phase, officially. The layout arose right in front of our visitor’s eyes. Not only for aviation and technology fans, the impressive Airport is the new Wunderland highlight. Up to 40 different aircrafts (from Cessna to Airbus A 380) are taxing independently on this Airport to the gates. They are also being moved back from the gates by push-back vehicles in order to taxi to the runway. There they are accelerating and taking off or landing respectively. Each aircraft is equipped with original lights and original, realistic turbine sounds at least in the take-off phase (otherwise the noise level would be unbearable).
In Gerrit’s Diary, we reported regularly about the construction progress. If you want to learn more, we welcome you to watch the videos on Youtube. You will find English subtitles.