Miniatur Wunderland Weekly Report
23.09.08 at 20:02 hrs
Weekly Report No 412, CW 38
From Monday, 15.09.2008 to Sunday, 21.09.2008
Currently, the emphasis is on the airport - be it the controls for the runway, the station, or the small details.
This cabinet was already shown shortly after it's delivery in report 396. Now it is in its final location and about to be wired. All future control units needed for the runway will be bundled here.
Gerhard and Christian are seen here at the "construction site" airport station, as they discuss some details like the ceiling color of the station. More discussions will, however, be nessessary, as…
… , for example, the detailling of the inner walls. Not an easy job to give a train station a unique look. Many detail questions will almost certainly cater for more heated discussions in this place! :-)
There's another big job coming up to the model builders in the next days. These parts will have to be assembled into the first large luggage carts this week.
The stores already sell the first christmas items. A good reason for us to also unpack the christmas lights and check their functions.
Not only the airport saw a lot of action during the last weeks but , just on a side note, the electronic department also turned out a new control board for the ships. (Version 356). The modular concept was given up (at least temporarily) and a single board solution was built instead - An absolute novelty is the card slot on the PC-board. It serves as automatic trip recorder which in the meantime is mandatory on every European ship :-)