Miniatur Wunderland Weekly Report
29.03.04 at 08:26 hrs
Weekly Report No 178, CW 13
From Monday, 22.03.2004 to Sunday, 28.03.2004This view shows the future Kid's corner (right) and the future main stairway up to the layout (left).
Here, we'll have the entrance, cashier's counter, and in the background will be the shop.
The view to the cashier's counter and the wardrobe
In the background of this picture is the lift connecting 3rd and 4th floor (this is especially important for strollers and wheelchair access).
This area, too, will soon be split into smaller rooms since next week the walls for the new bathrooms in the 3rd floor will be set up here.
View from the self service counter to the smoking area
Right, the kid's corner.
This area was initially planned to be part of the kitchen but is one can see, a wall had to be moved a bit..
At this position the second stairway to the 4th floor will be constructed. It is nessessary to make the bathrooms to the very left accessable.