Something's going on in America: The plans have been affixed to the benchwork. Heights and gradients are calculated and later on the subroadbed and streets will be cut out.

From next week on it should be possible again to watch us building the layout. The windows are already built into the dust-protecting walls and the curtains are sewn. Only the curtain mechanism which closes the curtains at model-night (we don't want Hamburg to be flooded with the working light) is not yet ready.

The Grand Canyon site

This is where...


The Grand Canyon site

the Grand Canyon goes in.


What is this?

To discuss in our forum: what might this be?


Helix construction

Three quarter of the track...


Helix construction

are down and wired in the first part of the helix.


Helix construction

At this point, 30 meters of track are laid...


Train crash

From the series "Serious train crashes in the Wunderland", we this time have a really spectacular scene.


Train crash

A double header with tank cars tries to push a train of gastanks out of the way. The tanker train of 3.5 meters (11.5 feet) is toppled over for it's entire length, even in the tunnel. Have fun cleaning up this mess ;-))